Bangalore (Bengaluru), capital of the Southern Indian state of Karnataka, has a population of 5.7 million in the metropolitan area and about 4.2 million within the city limits.

In 2003, Delhi Metro Rail Corporation (DMRC) commissioned a detailed study for a Metro, to be done along the same technical & financial approach used in Delhi. The study recommended a 2-line metro in the first phase, cross-shaped, 33 km long with 32 stations (an east-west line of 18km & a north-south line of 15km) intersecting in the city centre. About 8.9 km of the alignment within the city centre was to be underground and the rest on elevated viaducts. Station spacing was to be 1 km on average.

The initially proposed system was later expanded with three extensions totalling 9.3 km, bringing the total length of the first phase of construction to 42.4 km (with 41 stations) to be concluded in 2015/16:

East-West Line (Purple Line): 18.2 km (3.4 km underground)
North-South Line (Green Line): 24.2 km (3.3 km underground)

Construction started in spring 2007 on the elevated section from M.G. Road (Mahatma Gandhi Rd) to Baiyappanahalli.

 History
20 Oct 2011: Purple Line M.G. Road - Baiyappanahalli (7.5 km)
28 Feb 2014: Green Line Sampige Road - Peenya Industry (9.8 km)
01 May 2015: Green Line Peenya Industry - Nagasandra (2.4 km)
16 Nov 2015: Purple Line Mysore Road - Magadi Road (6.4 km)
30 April 2016: Purple Line Magadi Road - M.G. Road (4.8 km)
18 June 2017: Green Line Sampige Road - Yelachenahalli (12.0 km)
 Projects

Phase 2 of Namma Metro's expansion will add 72.1 km of trackage that includes 61 stations (13 km underground, the rest on viaducts). Phase 2 adds two new lines, apart from extensions of the lines built in Phase 1. When Phase-2 is completed, the total route length would be about 140 km (including the extension to airport) by 2017:

Purple Line: Mysore Road Kengeri (6.5 km, five stations)
Purple Line: Baiyyappanahalli Whitefield (15.5 km, 14 stations)

Green Line: Yelachenhalli Anjanapura (6.3 km, five stations)
Green Line: Nagasandra Bangalore International Exhibition Centre (3.8 km, three stations)

Line 3: RV Road Bonmasandra (18.8 km, 16 stations)
Line 4: Gottigere Nagawara (21.2 km, 18 stations)

A northern extension of a new north-south line up to the airport is also under consideration and this would add a further 25 km.

LIGHT RAIL:

The proposed LRT network comprises a 31 km line from Bannerghatta Road to Hebbal and a 9 km stretch from Magadi Road to the Peripheral Ring Road, with a total of 40 stations.