|
[ UrbanRail.Net ] [ Europe ] [ Americas ] [ Asia ] [ Africa ] [ Oceania ] [ News ] [ Books ] [ Links ] [ Blog ] |
|
PERUGIA
|
| Umbria . Italy |

| System | |
|
The system developed by the company Leitner is similar to a funicular railway, but with rubber-tyred cabins that are hauled by a moving rope, but detach from it while stopping in a station. The motor for the rope is installed at the upper terminus Pincetto. The line is double-track, with the trains running on metal beams at a minimum headway of 60 seconds. |
|
| History | |
|
29 Jan 2008: Pian di Massiano - Pincetto
|
|
| Photos | |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
| Photos 2008 © Alessio Monini | |
| Links | |
|
Minimetrò Official Site APM (Azienda Perugina della Mobilità)
|
|
2004 © UrbanRail.Net